logo

Curzon 2 Bridge on HS2 Project

Sector: Bridge • Location: United Kingdom

Source: Heavy Lift & Project Forwarding International

Project
Assembled

The tallest bridge on the UK's HS2 project, named Curzon 2, has been assembled. The bridge is 24 meters high and weighs 4,200 tonnes. Final checks are currently being carried out, and it is set to reach its final position on June 5, 2026.

Status
Prospective
Sector
Bridge, Rail
Location
United Kingdom
Updated
22 Jul 2026
Source
Heavy Lift & Project Forwarding International

ConstructChat

Ask ConstructChat about Curzon 2 Bridge on HS2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Curzon 2 Bridge on HS2 Project” is an infrastructure initiative in the Bridge sector, located in United Kingdom. Taiyo aggregates data on it from Heavy Lift & Project Forwarding International.

Participants

Not available for this record.

Status

Original status

assembled

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The tallest bridge on the UK's HS2 project, named Curzon 2, has been assembled. The bridge is 24 meters high and weighs 4,200 tonnes. Final checks are currently being carried out, and it is set to reach its final position on June 5, 2026.

Original sector

Transportation

Location

Country

United Kingdom (UK)

Source

Source

Heavy Lift & Project Forwarding International

URL

More Details

Record type

Project

Sector

Bridge, Rail

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project