Curzon 2 Bridge on HS2 Project
Sector: Bridge • Location: United Kingdom
Source: Heavy Lift & Project Forwarding International
The tallest bridge on the UK's HS2 project, named Curzon 2, has been assembled. The bridge is 24 meters high and weighs 4,200 tonnes. Final checks are currently being carried out, and it is set to reach its final position on June 5, 2026.
- Status
- Prospective
- Sector
- Bridge, Rail
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- Heavy Lift & Project Forwarding International
ConstructChat
Ask ConstructChat about Curzon 2 Bridge on HS2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | assembled |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The tallest bridge on the UK's HS2 project, named Curzon 2, has been assembled. The bridge is 24 meters high and weighs 4,200 tonnes. Final checks are currently being carried out, and it is set to reach its final position on June 5, 2026. |
Original sector | Transportation |
Location
Country | United Kingdom (UK) |
Source
Source | Heavy Lift & Project Forwarding International |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
