Custer Avenue Combined Sewer Control Facility – Additional Screens
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Atlanta Watershed
Constructed in the mid-1980s, the Custer Avenue Combined Sewer Control Facility (CSCF) receives disinfected wet weather flows from the Boulevard Regulator. Flows up to 500 million gallons per day (MGD) enter the Custer CSCF, receiving both coarse and fine screening, followed by chlorination and dechlorination. The screened flow is then routed to the East Area Water Quality Control Facility (WQCF)
- Status
- Failure
- Sector
- Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about Custer Avenue Combined Sewer Control Facility – Additional Screens
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | inactive/tbd |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Constructed in the mid-1980s, the Custer Avenue Combined Sewer Control Facility (CSCF) receives disinfected wet weather flows from the Boulevard Regulator. Flows up to 500 million gallons per day (MGD) enter the Custer CSCF, receiving both coarse and fine screening, followed by chlorination and dechlorination. The screened flow is then routed to the East Area Water Quality Control Facility (WQCF) via a tunnel. When the Custer Avenue CSCF screening capacity or the tunnel storage capacity is reached, excess flows are diverted around the Custer Avenue CSCF to Intrenchment Creek via tipping weirs and concrete channel. The Custer Avenue WQCF requires an upgrade to provide additional screening prior to watershed discharges of these excess flows. The screening facilities will remove floatables that are discharged over the tipping weirs. The scope of this project includes: Installing additional screens upstream and/or downstream of the tipping weirs, Installing a concrete channel, Providing for the collection, conveyance and disposal of screenings. Enhances system operational reliability, Ensures compliance with the CSCF permit requirements |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America (USA)
- Intrenchment Creek Viaduct Rehabilitation
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
- Clear Creek Chemical System Improvements (Bid Package 1) and System-wide Flow
- Division Street/Route 65 Interchange Project
- Sorrels Overpass Over I-70
- Route 39 Railroad Crossing Improvements/Overpass/Quiet Zone
- I-44 Rebuild at MO 744/Mulroy Road
- Route D and Truman Boulevard Bridge Rehabilitation
