logo
ProjectInactive/Tbd

Custer Avenue Combined Sewer Control Facility – Additional Screens

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Atlanta Watershed

Constructed in the mid-1980s, the Custer Avenue Combined Sewer Control Facility (CSCF) receives disinfected wet weather flows from the Boulevard Regulator. Flows up to 500 million gallons per day (MGD) enter the Custer CSCF, receiving both coarse and fine screening, followed by chlorination and dechlorination. The screened flow is then routed to the East Area Water Quality Control Facility (WQCF)

Status
Failure
Sector
Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about Custer Avenue Combined Sewer Control Facility – Additional Screens

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Custer Avenue Combined Sewer Control Facility – Additional Screens” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

inactive/tbd

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Constructed in the mid-1980s, the Custer Avenue Combined Sewer Control Facility (CSCF) receives disinfected wet weather flows from the Boulevard Regulator. Flows up to 500 million gallons per day (MGD) enter the Custer CSCF, receiving both coarse and fine screening, followed by chlorination and dechlorination. The screened flow is then routed to the East Area Water Quality Control Facility (WQCF) via a tunnel. When the Custer Avenue CSCF screening capacity or the tunnel storage capacity is reached, excess flows are diverted around the Custer Avenue CSCF to Intrenchment Creek via tipping weirs and concrete channel. The Custer Avenue WQCF requires an upgrade to provide additional screening prior to watershed discharges of these excess flows. The screening facilities will remove floatables that are discharged over the tipping weirs. The scope of this project includes: Installing additional screens upstream and/or downstream of the tipping weirs, Installing a concrete channel, Providing for the collection, conveyance and disposal of screenings. Enhances system operational reliability, Ensures compliance with the CSCF permit requirements

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Manufacturing (Industrial), Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project