Cutbank Rural Pipeline Utility Regional Water Treatment Upgrades
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Infrastructure Canada
Regional Potable Water System Upgrade: The main objective of the project is to address ongoing non-compliances in the potable water treatment system for the Cutbank Rural Pipeline Utility (CRPU). The project will provide increased access to potable water that complies with provincial drinking water regulations for all existing and future users. The CRPU users consist of approximately 90 rural user
- Status
- Prospective
- Sector
- Power Transmission, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Residential
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Cutbank Rural Pipeline Utility Regional Water Treatment Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Regional Potable Water System Upgrade: The main objective of the project is to address ongoing non-compliances in the potable water treatment system for the Cutbank Rural Pipeline Utility (CRPU). The project will provide increased access to potable water that complies with provincial drinking water regulations for all existing and future users. The CRPU users consist of approximately 90 rural users in the RM of Loreburn, Danielson Provincial Park, Water Security Agency regional office, SaskPower Coteau Creek Power Station. The project work will involve the expansion of the existing water treatment plant building, replacement of the membrane filtration system, replacement of the chemical feed system, the addition of upstream clarifiers, the addition of potable water storage, construction of residuals management ponds, and distribution pipeline looping as required. The project will increase access to potable water. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
