Cutia Wind Farm
Sector: Warehouse • Location: Brazil
Source: World Bank Group
The project entails the construction of the 23.1 MW Cutia Wind Farm part of the Cutia Wind Complex. SPV is UEE Cutia S.A., a wholly owned subsidiary of the sponsor Copel that covers 69 % of the total cost ($ 25.45 million) while the rest ($ 11.43 million) is provided as debt by BNDES. The concession period is 28 years and was awarded to the company at the 6th LER auction in Brazil. Financial close
- Status
- Prospective
- Sector
- Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cutia Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of the 23.1 MW Cutia Wind Farm part of the Cutia Wind Complex. SPV is UEE Cutia S.A., a wholly owned subsidiary of the sponsor Copel that covers 69 % of the total cost ($ 25.45 million) while the rest ($ 11.43 million) is provided as debt by BNDES. The concession period is 28 years and was awarded to the company at the 6th LER auction in Brazil. Financial close took place on September 28, 2018. Construction was completed on September 20, 2019. https://www.terra.com.br/economia/copel-bndes-aprova-financiamento-para-empreendimento-eolico-cutia,5c93b5a8acc20479b9494fbe5496bc67hpuhf5g8.html https://sec.report/Document/0001292814-18-001238, https://renewablesnow.com/news/brazils-copel-starts-test-operations-at-181-mw-wind-farm-627419/ |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
