logo

Cutrona Subdivision Water Main Upgrades

Sector: Water Supply and Storage • Location: Bradenton, Florida, United States of America

Source: Dodge USA

Project
Pre-Design

This project is a loop system between Cutrona Subdivision and Frank E Kimball Subdivision (see map attached for location of proposed main). This project needs +/- 3,718 ft of water main. This will help maintain water quality and improve fire flow. Three (3) fire hydrant assemblies, five (5) gate valves, and 62 services. Hydrants, services and valves should be installed to County and Ten State Stan

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Bradenton, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cutrona Subdivision Water Main Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cutrona Subdivision Water Main Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Bradenton, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is a loop system between Cutrona Subdivision and Frank E Kimball Subdivision (see map attached for location of proposed main). This project needs +/- 3,718 ft of water main. This will help maintain water quality and improve fire flow. Three (3) fire hydrant assemblies, five (5) gate valves, and 62 services. Hydrants, services and valves should be installed to County and Ten State Standards. The Manatee County may be seeking a consultant to prepare a Design for Cutrona Subdivision...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Bradenton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project