logo

Cycle 11 Traffic Calming

Sector: Water Supply and Storage • Location: Spokane, Washington, United States of America

Source: Dodge USA

Project
Closed

This project consists of the construction of approximately 1,400 linear feet of curb or curb and gutter, 700 square yards of sidewalk, 200 square yards of colored concrete, 350square yards of HMA pavement repair, 1 Pedestrian Hybrid Beacon system, 4 speed feedback sign installations, 150 linear feet of storm sewer, 4 drainage structures, 10 landscape boulders, 21 tree plantings, sundry utility adj

Status
Closed
Sector
Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)
Location
Spokane, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cycle 11 Traffic Calming

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cycle 11 Traffic Calming” is an infrastructure initiative in the Water Supply and Storage sector, located in Spokane, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the construction of approximately 1,400 linear feet of curb or curb and gutter, 700 square yards of sidewalk, 200 square yards of colored concrete, 350square yards of HMA pavement repair, 1 Pedestrian Hybrid Beacon system, 4 speed feedback sign installations, 150 linear feet of storm sewer, 4 drainage structures, 10 landscape boulders, 21 tree plantings, sundry utility adjustments, and other related miscellaneous items.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Spokane

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project