Cycle 11 Traffic Calming
Sector: Water Supply and Storage • Location: Spokane, Washington, United States of America
Source: Dodge USA
This project consists of the construction of approximately 1,400 linear feet of curb or curb and gutter, 700 square yards of sidewalk, 200 square yards of colored concrete, 350square yards of HMA pavement repair, 1 Pedestrian Hybrid Beacon system, 4 speed feedback sign installations, 150 linear feet of storm sewer, 4 drainage structures, 10 landscape boulders, 21 tree plantings, sundry utility adj
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cycle 11 Traffic Calming
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the construction of approximately 1,400 linear feet of curb or curb and gutter, 700 square yards of sidewalk, 200 square yards of colored concrete, 350square yards of HMA pavement repair, 1 Pedestrian Hybrid Beacon system, 4 speed feedback sign installations, 150 linear feet of storm sewer, 4 drainage structures, 10 landscape boulders, 21 tree plantings, sundry utility adjustments, and other related miscellaneous items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
