Cycle 3 Sewer Infrastructure Improvements
Sector: Water Supply and Storage • Location: Manhattan Beach, California, United States of America
Source: Dodge USA
The Cycle 3 Sewer Improvements Project (E1297-24C) is a Public Works construction project to repair or replace seven (7) segments of pipe on 7th St, 18th St, 19th St, Highview Ave, within an easement between 36th Pl and Rosecrans Ave, and in Polliwog Park. A sewer manhole lid will also be replaced in Manhattan Village. The work includes, but is not limited to, replacing 260 linear feet (LF) of 8 V
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Construction Documents |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Cycle 3 Sewer Improvements Project (E1297-24C) is a Public Works construction project to repair or replace seven (7) segments of pipe on 7th St, 18th St, 19th St, Highview Ave, within an easement between 36th Pl and Rosecrans Ave, and in Polliwog Park. A sewer manhole lid will also be replaced in Manhattan Village. The work includes, but is not limited to, replacing 260 linear feet (LF) of 8 VCP sewer main, installing 741 LF of CIPP liner, spot repairing/replacing 42 LF of 6 VCP sewer mai... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
