Cyclic Sewer Replacement Phase 21
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing sanitary sewer mains, sewer laterals, maintenance holes, cleanouts, curb, gutter, sidewalk, driveway, street patch, water pollution control, traffic controls and all other associated work to complete the project at the locations designated in the plans.
- Status
- Closed
- Sector
- Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive
- Location
- Alameda, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cyclic Sewer Replacement Phase 21
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing sanitary sewer mains, sewer laterals, maintenance holes, cleanouts, curb, gutter, sidewalk, driveway, street patch, water pollution control, traffic controls and all other associated work to complete the project at the locations designated in the plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Alameda |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
