logo

Cypark-LG Negeri Sembilan Solar Plant

Active · Malaysia

Source: World Bank Group

Project
Active

Cypark Resources BHd, the Malaysian energy project developer signed a joint agreement with the Korean electronics firm LG to develop a pipeline of projects, the first being an 8 MW solar farm to be located in Negeri Sembilan state.

The output was to be supplied to Tenaga Nasional Berhad (TNB), at a tariff of 95 sen (US$0.30) per MW. The project signed a 21 year Renewable Energy Power Purchase A

Status
Prospective
Sector
Biomass, Car parking, Power Generation (CCGT), Raw Materials, Solar, Automotive, Commercial, Government
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cypark-LG Negeri Sembilan Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cypark-LG Negeri Sembilan Solar Plant” is an infrastructure initiative in the Biomass sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Cypark Resources BHd, the Malaysian energy project developer signed a joint agreement with the Korean electronics firm LG to develop a pipeline of projects, the first being an 8 MW solar farm to be located in Negeri Sembilan state. The output was to be supplied to Tenaga Nasional Berhad (TNB), at a tariff of 95 sen (US$0.30) per MW. The project signed a 21 year Renewable Energy Power Purchase Agreement (REPPA) with TNB, under the FiT scheme. Precise details on the contractual arrangement between the two firms were not publicly available, however public sources indicated that in March 2011 Cypark Resources had signed a 75m ringgit ( USD 24 million) loan agreement with HSBC Amanah Malaysia to finance the project. The project became operational in March 2012, when phase 2 started construction: 5MW PV + 2MW biogas. http://www.rechargenews.com/energy/solar/article279855.ece http://www.theedgemalaysia.com/index.php?option=com_content&task=view&id=193389&Itemid=2 http://biz.thestar.com.my/news/story.asp?file=/2011/3/9/business/8216221 http://www.greenprospectsasia.com/content/cypark-integrated-energy-park-malaysia-starts-supplying-solar-power-grid-march-28th

Original sector

Energy

Budget

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Car parking, Power Generation (CCGT), Raw Materials, Solar, Automotive, Commercial, Government

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project