Cypress Knee Solar project
Sector: Power Generation (CCGT) • Location: Arkansas, USA
Source: Renewables Now
EDP Renewables North America (EDPR NA) has signed a long-term power purchase agreement (PPA) with Meta Platforms Inc to supply electricity generated by the 250-MW Cypress Knee Solar project in Arkansas. The solar farm will be built in Chicot County, with construction expected to complete by 2028. The project is expected to generate about USD 25 million in new revenue for the local county over its
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Raw Materials
- Location
- Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about Cypress Knee Solar project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EDP Renewables North America (EDPR NA) has signed a long-term power purchase agreement (PPA) with Meta Platforms Inc to supply electricity generated by the 250-MW Cypress Knee Solar project in Arkansas. The solar farm will be built in Chicot County, with construction expected to complete by 2028. The project is expected to generate about USD 25 million in new revenue for the local county over its lifetime and create several hundred jobs during construction. |
Original sector | Renewable Energy |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Raw Materials |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Lotte Chemical MEG-1 Project
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- Google and Elementl Power Nuclear Energy Partnership
- Tanker On-Shore Power Supply Compatibility Assessment
- East Hampton Circle Reconstruction
- Rice University Data Center Heat to Electricity Project
