logo
ProjectConstruction Documents

CyrusOne - SATV 1.5MW Load Adder

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

construct two equipment lineups in the equipment yard on the existing 2-Story Data Center. Two chillers will be installed on the roof to support the new equipment lineups.

Status
Closed
Sector
Data Center, Power Generation (CCGT), Power Transmission, Commercial
Location
San Antonio, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CyrusOne - SATV 1.5MW Load Adder

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CyrusOne - SATV 1.5MW Load Adder” is an infrastructure initiative in the Data Center sector, located in San Antonio, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

construct two equipment lineups in the equipment yard on the existing 2-Story Data Center. Two chillers will be installed on the roof to support the new equipment lineups.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Power Transmission, Commercial

Article published date

2023-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project