logo

CYtown-Parking and Infrastructure-Phase 2

One of 10,000+ projects Taiyo tracks in Iowa.

Source: Dodge USA

Project
Closed

The project consists of, but is not limited to, demolition of existing parking lots A3 (previous A1/A2), B3 (previous B1/B2), C3 (previous C1/C2) and adjacent drives, soil import, grading, installation of underground utilities (including sanitary sewer, storm sewer, water main, electric and communications), subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.

Status
Closed
Sector
Water Supply and Storage, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Automotive, Commercial
Location
Ames, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CYtown-Parking and Infrastructure-Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CYtown-Parking and Infrastructure-Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Ames, Iowa, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of, but is not limited to, demolition of existing parking lots A3 (previous A1/A2), B3 (previous B1/B2), C3 (previous C1/C2) and adjacent drives, soil import, grading, installation of underground utilities (including sanitary sewer, storm sewer, water main, electric and communications), subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Ames

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Automotive, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project