Łódź High-Speed Tunnel Signalling System
Sector: Rail • Location: Łódź, Poland
Source: Railway PRO
Alstom was awarded the contract to design and install the railway traffic control signalling system inside the Łódź high-speed tunnel, including integration with the Łódź Widzew station area. The tunnel is part of the 'Y' railway line under the Port Polska programme, enabling train operations up to 350 km/h and connecting Warsaw, the new national airport, Łódź, Wrocław, and Poznań.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Alstom was awarded the contract to design and install the railway traffic control signalling system inside the Łódź high-speed tunnel, including integration with the Łódź Widzew station area. The tunnel is part of the 'Y' railway line under the Port Polska programme, enabling train operations up to 350 km/h and connecting Warsaw, the new national airport, Łódź, Wrocław, and Poznań. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
