Dabhol LNG Terminal Capacity Expansion
Planned · Maharashtra · Last reported Jun 2025
Source: Indian Masterminds
GAIL has announced plans to expand the Dabhol LNG Terminal's regasification capacity from 5.0 MMTPA to 6.3 MMTPA in the first phase over the next three years, aiming to handle up to 100 LNG cargoes annually once expanded.
- Status
- Prospective
- Sector
- LNG
- Location
- Dabhol, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Indian Masterminds
ConstructChat
Ask ConstructChat about Dabhol LNG Terminal Capacity Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GAIL has announced plans to expand the Dabhol LNG Terminal's regasification capacity from 5.0 MMTPA to 6.3 MMTPA in the first phase over the next three years, aiming to handle up to 100 LNG cargoes annually once expanded. |
Original sector | Energy |
Location
Country | India |
State | Maharashtra |
City | Dabhol |
Source
Source | Indian Masterminds |
URL |
More Details
Record type | Project |
Sector | LNG |
Article published date | 2025-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More LNG projects in India
- Dabhol LNG-Fired Power Plant - Phase II
- Liquid Chemical Project at Dahej
- Dabhol LNG Terminal
- Torrent Energy Limited (Dahej)
- Sugen 1100MW CCGT Akhakhol Gujarat
- UNOSUGEN Gas Power Plant
- Dabhol LNG-Fired Power Plant - Phase I
- Setting Up of Floating Storage and Regasification Unit in Mumbai Harbour on DBFOT Basis
