Dabhol LNG Terminal Expansion and Breakwater Completion
Sector: LNG • Location: Dabhol, Maharashtra, India
Source: ETV Bharat
In May 2025, the Dabhol LNG terminal began full monsoon-season operations after completing a long-pending breakwater system, allowing uninterrupted LNG imports during adverse weather. The terminal is also expanding its capacity from 5 to 6.3 million tonnes per annum (mtpa) to support India's target of increasing natural gas share in the energy mix from 6% to 15% by 2030.
- Status
- Under Construction
- Sector
- LNG, Natural Gas, Oil and Gas
- Location
- Dabhol, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- ETV Bharat
ConstructChat
Ask ConstructChat about Dabhol LNG Terminal Expansion and Breakwater Completion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In May 2025, the Dabhol LNG terminal began full monsoon-season operations after completing a long-pending breakwater system, allowing uninterrupted LNG imports during adverse weather. The terminal is also expanding its capacity from 5 to 6.3 million tonnes per annum (mtpa) to support India's target of increasing natural gas share in the energy mix from 6% to 15% by 2030. |
Original sector | Oil and Gas |
Location
Country | India |
State | Maharashtra |
City | Dabhol |
Source
Source | ETV Bharat |
URL |
More Details
Record type | Project |
Sector | LNG, Natural Gas, Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More LNG projects in India
- Sugen 1100MW CCGT Akhakhol Gujarat
- UNOSUGEN Gas Power Plant
- Dabhol LNG-Fired Power Plant - Phase I
- Pipavav Port
- Setting Up of Floating Storage and Regasification Unit in Mumbai Harbour on DBFOT Basis
- The Project of LNG Port & Terminal Facility in the Puthuvypeen sea at Cochin Port CA (Opens New Window)
- Tanir Bavi Power Company
- Jagdishpur-Haldia and Bokaro-Dhamra Pipeline Phase Two
