Daimler Truck Cambridge Office Remodel
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge USA
demolition of all existing office etc and mezzanine - renovations and new 2 story entry addition 1.0 Final Cleaning 3.0 Cast In Place Concrete 4.0 Masonry 5.0 Structural Steel 6.3 General Trades 7.2 Roofing 7.6 EIFS/Stucco 8.1 Aluminum, Glass & Glazing 9.0 Drywall & Acoustical 9.2 Flooring 9.9 Painting & Wall Covering 14.0 Elevators 21.0 Fire Protection 22.0 Plumbing 23.0 HVAC 26.0 Electrical 31.0
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Road, Residential, Steel, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Byesville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Daimler Truck Cambridge Office Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | demolition of all existing office etc and mezzanine - renovations and new 2 story entry addition 1.0 Final Cleaning 3.0 Cast In Place Concrete 4.0 Masonry 5.0 Structural Steel 6.3 General Trades 7.2 Roofing 7.6 EIFS/Stucco 8.1 Aluminum, Glass & Glazing 9.0 Drywall & Acoustical 9.2 Flooring 9.9 Painting & Wall Covering 14.0 Elevators 21.0 Fire Protection 22.0 Plumbing 23.0 HVAC 26.0 Electrical 31.0 Earthwork/Utilities/Clearing 32.0 Asphalt Paving & Striping 32.1 Landscaping & Irrigation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Byesville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Road, Residential, Steel, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
