Dairy Queen - Pearson, GA
Sector: Raw Materials • Location: Pearson, Georgia, United States of America
Source: Dodge
The project consists of the conversion of a Hardee's restaurant to become a new Dairy Queen with an outside deck based upon the core 46 Dairy Queen standards. There will be demolition of existing walls and exterior concrete, new walls, new equipment, new finishes, new roof, new parking lot and driveway revisions
- Status
- Closed
- Sector
- Raw Materials, Car parking, Road, Consumer Products, Cement, Automotive, Commercial
- Location
- Pearson, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dairy Queen - Pearson, GA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the conversion of a Hardee's restaurant to become a new Dairy Queen with an outside deck based upon the core 46 Dairy Queen standards. There will be demolition of existing walls and exterior concrete, new walls, new equipment, new finishes, new roof, new parking lot and driveway revisions |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Pearson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Car parking, Road, Consumer Products, Cement, Automotive, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
