The Dairy Trust plant was built on a greenfield site in Southland. The roof was installed in a single section. The completed milk powder production plant is the first investment for Dairy Trust. New Zealand’s Dairy Trust is the country’s latest dairy processing company to form following the industry’s restructure seven years ago. Its rapid expansion has seen the dairy become a serious rival to Fon

Project Information FAQ

Project Information

3 Q
The project “Dairy Trust Milk Processing Plant” is an infrastructure initiative in the Advanced Electronics sector, located in New Zealand. Taiyo aggregates data on it from Food Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dairy Trust plant was built on a greenfield site in Southland. The roof was installed in a single section. The completed milk powder production plant is the first investment for Dairy Trust. New Zealand’s Dairy Trust is the country’s latest dairy processing company to form following the industry’s restructure seven years ago. Its rapid expansion has seen the dairy become a serious rival to Fonterra for domestic milk supply. Dairy Trust took control of Open Country Cheese in July 2007 by obtaining a majority interest and has since made plans to invest in a network of dairy processing plants in Southland, Wanganui, Waikato and Northland. In July 2008 Singapore-based Olam International acquired a 25% stake in Dairy Trust for $101m. This additional capital allowed Dairy Trust to obtain complete control of Open Country Cheese by purchasing the remaining shares. Dairy Trust’s first plant in Awarua, Invercargill, began operations on 5 August 2008. In 2008-09, the dairy plant processed 144 million litres. In January 2009, Dairy Trust changed its name to Open Country Dairy. The company opened a whole milk plant in Wanganui. The plant commenced operations in August 2009 and has an annual capacity of 200 million litres of milk. Construction Construction of the Awarua plant began in September 2007 on a greenfield site adjacent to a meat processing plant near Invercargill. The plant consists of a 31m milk drying tower, tanker unloading bays, silo pads, a packing room, lactose debagging facility, control room, offices and amenities. The plant will receive about 175 million litres of whole milk from around 80 suppliers. The milk will be pasteurised and dried into powder using a 750kW mechanical vapour recompression fan before being supplied to the food industry. The Awarua plant has the capacity to process one million litres of milk each day and is capable of drying 50,000l of milk per hour to generate 7.4t of milk powder an hour. In addition, the 8t of cream generated from the plant each day is processed at another location. The state-of-the-art plant is fully computer controlled and employs 17 staff. Expansion In 2009, Open Country commenced a $5m upgrade programme for the Awarua plant. The programme included the installation of a new 20t baghouse. The 14m-long and 7m-wide baghouse was manufactured in China and installed in June 2009. The baghouse came on-stream in August 2009 and increased the capacity of the plant to 200 million litres. It utilises filter bags to obtain milk powder during the drying process. The baghouse is expected to improve the yield of the dairy plant. Open Country is expects 99% yield from the baghouse. Contractors The facility was constructed by Ebert Construction and the architect was Dickson Lonergan. The processing plant was manufactured and installed by GEA Process Engineering. Silvester Clark was the consulting engineering firm for the structural design of the facility, while Steel Pencil provided structural 3D modelling/drawing and steel detailing services for the plant. NDA Engineering fabricated the stainless steel drying and evaporating equipment for the plant. Fabrication services were provided by ETech, Protech Stainless Steel, Weldtech, John Jones Steel and Gary Dennison Joinery. Other subcontractors included Blair Concrete Construction (foundations); Bond Contracts (underground services); Industrial Surefloors (flooring installations); Stresscrete Southland (precast concrete panels and flooring sections). Bad weather delayed the building process by 31 days and with penalty clauses in place to cover late completion it was a struggle to finish the plant on time. The weather dictated that a 36t cone roof for the drying tower be fabricated on the ground in one piece and then positioned. EIS was awarded the contract for installation of the baghouse. The contract was worth $250,000. Local contractors were hired for other construction works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data