Dakar Bus Rapid Transit
Sector: Seaport • Location: Senegal
Source: International Finance Corporation (IFC)
The PPP advisory mandate involves assistance in the structuring and implementation of the private sector components of the BRT (Bus Rapid transit) Project that Government of Senegal (GoS) is implementing with IDA financing assistance. The aim of the project is to launch a new bus-based pilot route for a BRT system. The project will consist in a 18.3km from Guediawaye to downtown Dakar on fully d
- Status
- Closed
- Sector
- Seaport, Commercial, Mass Transit, Road, Government, Residential
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Dakar Bus Rapid Transit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The PPP advisory mandate involves assistance in the structuring and implementation of the private sector components of the BRT (Bus Rapid transit) Project that Government of Senegal (GoS) is implementing with IDA financing assistance. The aim of the project is to launch a new bus-based pilot route for a BRT system. The project will consist in a 18.3km from Guediawaye to downtown Dakar on fully dedicated bus lanes. The Project consists broadly of (i) Transport infrastructure: construction of busway, terminals and stations estimated at US$ 330m; and (ii) Transport equipment and systems: procurement of bus fleet, operating system and passenger information system estimated at around US$ 60m. The transport infrastructure component would be financed by the GoS under loans from the World Bank, while the transport equipment and systems component will fall under the remit of the private operator for the envisaged PPP. IFC’s mandate will be structured around 2 phases: Phase 1 (analyses and structuring) to analyze institutional, economic and environmental & social aspects as well as undertake detailed technical and legal due diligence, commercial and tariff analyses and financial modelling. During this phase, a proposed structuring of the transaction will be discussed with GoS. Once the Government makes a decision, phase 2 (implementation) can start with marketing to potential investors, and preparation of tender until the selection of an Operator for the BRT. |
Procurement method |
Location
Country | Senegal |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Seaport, Commercial, Mass Transit, Road, Government, Residential |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
