DAKAR PORT
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Port of Dakar Project for Senegal consists of: (a) the extension of the existing Mole 3, to increase the handling capacity for Mali traffic, and the reconstruction of the quay wall in the adjacent East Basin, with dredging alongside to 10 m depth; (b) reconstruction of the quay wall of the Middle Basin, with dredging alongside to 10 m depth; (c) dredging to provide improved access for cargo ve
- Status
- Closed
- Sector
- Fertilizers, Seaport, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DAKAR PORT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Port of Dakar Project for Senegal consists of: (a) the extension of the existing Mole 3, to increase the handling capacity for Mali traffic, and the reconstruction of the quay wall in the adjacent East Basin, with dredging alongside to 10 m depth; (b) reconstruction of the quay wall of the Middle Basin, with dredging alongside to 10 m depth; (c) dredging to provide improved access for cargo vessels to the southern sector of the Port and to permit deeper draft vessels for phosphate exports. |
Original sector | Transportation |
Location
Country | Senegal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
