Dakawa Integrated Irrigation Project II (Study)
Sector: Water Supply and Storage • Location: Tanzania
Source: African Development Bank (AfDB)
- To identify the optimal use of the existing ressources under Dakawa phase I; 2) To identify the rehabilitation needs of Dakawa phase I and make recommendations on how these will be met in the phase II project; 3) To conduct studies in the proposed project expansion area of about 2000 ha net with a view of assessing its suitability for the planned farm extension, testing the feasibility of intro
- Sector
- Water Supply and Storage, Government, Fertilizers, Manufacturing (Industrial), Raw Materials
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Dakawa Integrated Irrigation Project II (Study)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1) To identify the optimal use of the existing ressources under Dakawa phase I; 2) To identify the rehabilitation needs of Dakawa phase I and make recommendations on how these will be met in the phase II project; 3) To conduct studies in the proposed project expansion area of about 2000 ha net with a view of assessing its suitability for the planned farm extension, testing the feasibility of introducing diversification to the farming activities at Dakawa, possibly to include crop husbandry, livestock entreprises and agro-industrial activities. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Tanzania |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Fertilizers, Manufacturing (Industrial), Raw Materials |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Open for FDI through a majority stake/Establishment of storage or distribution/sales outlet/Manufacture of tanks, reservoirs and containers of metal/EDCOM LIMITED
