logo

Dakota Access Pipeline

Sector: Oil and Gas • Location: Bismarck, North Dakota, United States

Source: KFYR-TV

Project
Operational

The Dakota Access Pipeline is a 1,172-mile-long oil pipeline initially designed to transport half a million barrels of oil a day from North Dakota to Illinois. It faced significant protests and legal challenges related to environmental and land concerns. The pipeline became fully operational in June 2017 and as of 2026, it has a capacity to transport up to 750,000 barrels of oil per day, increased

Status
Under Construction
Sector
Oil and Gas
Location
Bismarck, North Dakota, United States of America
Updated
22 Jul 2026
Source
KFYR-TV

ConstructChat

Ask ConstructChat about Dakota Access Pipeline

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Dakota Access Pipeline” is an infrastructure initiative in the Oil and Gas sector, located in Bismarck, North Dakota, United States. Taiyo aggregates data on it from KFYR-TV.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Dakota Access Pipeline is a 1,172-mile-long oil pipeline initially designed to transport half a million barrels of oil a day from North Dakota to Illinois. It faced significant protests and legal challenges related to environmental and land concerns. The pipeline became fully operational in June 2017 and as of 2026, it has a capacity to transport up to 750,000 barrels of oil per day, increased from its initial capacity of 470,000 to 570,000 barrels per day. The Army Corps of Engineers continues to oversee safety conditions for the pipeline.

Original sector

Energy

Location

Country

United States of America (USA)

State

North Dakota

City

Bismarck

Source

Source

KFYR-TV

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project