logo

Dakrong 3 Hydropower Plant

Sector: Wind • Location: Vietnam

Source: World Bank Group

Project
Active

Truong Son Hydroelectric JSC, a private entity, was planning the development of the 8MW Dakrong 3 Hydropower Plant, Ta Long commune, Dakrong district, Quang Tri province. The project was expected to generate 31,370 MWh annually to the national grid via a 35kV transmission line of 3.4km to the Khe Sanh station.

The project was designed to consist of 2 Francis vertical shaft turbines of 4.135 MW ea

Project Information FAQ

Project Information

5 Q
The project “Dakrong 3 Hydropower Plant” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Truong Son Hydroelectric JSC, a private entity, was planning the development of the 8MW Dakrong 3 Hydropower Plant, Ta Long commune, Dakrong district, Quang Tri province. The project was expected to generate 31,370 MWh annually to the national grid via a 35kV transmission line of 3.4km to the Khe Sanh station. The project was designed to consist of 2 Francis vertical shaft turbines of 4.135 MW each and 2 generators of 4 MW each. Commissioning was expected for January 2012. The plant load factor was expected to be 45.68%. The power tariff was VND 793 per kWh, $0.0381 per kWh. Construction started in 2010, the construction contract was signed in August 2010 Total project cost was estimated at VND 187,538 million ( $8.9 million). Debt to equity ratio was 70/30, the lending rate was 13.41% with a tenor of 10 years and a 2 year grace period. Financial close date was unknown, assumed here was August 2010 (signing EPC contract). http://cdm.unfccc.int/filestorage/Z/A/B/ZABW8V4LSEURG2DP63YQ7ICJO9MHX5/PDD.pdf?t=Ujl8bTIyZjBzfDB-pWH_eBshwDGibxMA-GXK Debt size deducted from debt/equity ratio All info from CDM/PDD

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data