logo

Dakrong 3 Hydropower Plant

Sector: Wind • Location: Vietnam

Source: World Bank Group

Project
Active

Truong Son Hydroelectric JSC, a private entity, was planning the development of the 8MW Dakrong 3 Hydropower Plant, Ta Long commune, Dakrong district, Quang Tri province. The project was expected to generate 31,370 MWh annually to the national grid via a 35kV transmission line of 3.4km to the Khe Sanh station.

The project was designed to consist of 2 Francis vertical shaft turbines of 4.135 MW ea

Status
Prospective
Sector
Wind, Hydro, Power Generation (CCGT), Government, Commercial
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dakrong 3 Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dakrong 3 Hydropower Plant” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Truong Son Hydroelectric JSC, a private entity, was planning the development of the 8MW Dakrong 3 Hydropower Plant, Ta Long commune, Dakrong district, Quang Tri province. The project was expected to generate 31,370 MWh annually to the national grid via a 35kV transmission line of 3.4km to the Khe Sanh station. The project was designed to consist of 2 Francis vertical shaft turbines of 4.135 MW each and 2 generators of 4 MW each. Commissioning was expected for January 2012. The plant load factor was expected to be 45.68%. The power tariff was VND 793 per kWh, $0.0381 per kWh. Construction started in 2010, the construction contract was signed in August 2010 Total project cost was estimated at VND 187,538 million ( $8.9 million). Debt to equity ratio was 70/30, the lending rate was 13.41% with a tenor of 10 years and a 2 year grace period. Financial close date was unknown, assumed here was August 2010 (signing EPC contract). http://cdm.unfccc.int/filestorage/Z/A/B/ZABW8V4LSEURG2DP63YQ7ICJO9MHX5/PDD.pdf?t=Ujl8bTIyZjBzfDB-pWH_eBshwDGibxMA-GXK Debt size deducted from debt/equity ratio All info from CDM/PDD

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project