Dakrosa II SHPP
Sector: Commercial • Location: Kon Tum, Vietnam
Source: World Bank Group
Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%
- Status
- Prospective
- Sector
- Commercial, Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Government
- Location
- Kon Tum, Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Dakrosa II SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%. In October 2012, Thac Mo Hydro Power Joint Stock (a subsidiary of EVN) purchased 61% of the equity in the developer at a price of 48.3 million Dong (US$230,000). The output is sold to the national grid and evacuated via a 22kV line. Tariff was expected to be 601 Dong/kWh. Operational life was estimated at 30 years. Total investment was estimated at 50,371 million Dong US$2.4 million). Financing was expected to be done on a 60/40 debt to equity basis, with a commercial loan priced at 12.75% and a tenor of 12 years and 2 years grace. Based on D/E of 60/40, the total debt size was US$1.44 million, and US$ 0.96 million in equity. Project IRR was calculated at 9.02% without CDM financing and 15.56% with CDM financing. The project applied for UNFCCC CDM financing. Project location: 14o 43'04"N 107o 49'10"E http://www.intellasia.net/tmp-invests-48-3b-dong-in-dakrosa-hydropower-firm-240627 https://cdm.unfccc.int/filestorage/G/C/4/GC4XDI2MT6W8H0ERFO9BL37AJPZK51/PDD_Dakrosa2.pdf?t=VEh8bWhybW1kfDB2P_xe1UJDFfisIidXpfHF |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
State | Kon Tum |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
