logo

Dakrosa II SHPP

Sector: Commercial • Location: Kon Tum, Vietnam

Source: World Bank Group

Project
Active

Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%

Status
Prospective
Sector
Commercial, Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Government
Location
Kon Tum, Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dakrosa II SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dakrosa II SHPP” is an infrastructure initiative in the Commercial sector, located in Kon Tum, Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%. In October 2012, Thac Mo Hydro Power Joint Stock (a subsidiary of EVN) purchased 61% of the equity in the developer at a price of 48.3 million Dong (US$230,000). The output is sold to the national grid and evacuated via a 22kV line. Tariff was expected to be 601 Dong/kWh. Operational life was estimated at 30 years. Total investment was estimated at 50,371 million Dong US$2.4 million). Financing was expected to be done on a 60/40 debt to equity basis, with a commercial loan priced at 12.75% and a tenor of 12 years and 2 years grace. Based on D/E of 60/40, the total debt size was US$1.44 million, and US$ 0.96 million in equity. Project IRR was calculated at 9.02% without CDM financing and 15.56% with CDM financing. The project applied for UNFCCC CDM financing. Project location: 14o 43'04"N 107o 49'10"E http://www.intellasia.net/tmp-invests-48-3b-dong-in-dakrosa-hydropower-firm-240627 https://cdm.unfccc.int/filestorage/G/C/4/GC4XDI2MT6W8H0ERFO9BL37AJPZK51/PDD_Dakrosa2.pdf?t=VEh8bWhybW1kfDB2P_xe1UJDFfisIidXpfHF

Original sector

Energy

Budget

Location

Country

Vietnam

State

Kon Tum

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project