logo

Dakrosa II SHPP

Sector: Water Supply and Storage • Location: Vietnam

Source: World Bank Group

Project
Active

Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%

Project Information FAQ

Project Information

4 Q
The project “Dakrosa II SHPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dakrosa Hydropower JSC, a subsidiary of Thac Mo Hydro Power Joint Stock Company in turn a subsidiary of EVN, developed the 2.4MW Dakrosa 2 small hydropower plant, Ngoc Tu Commune, Dak To District, Kon Tum Province. The project was expected to generate 10,986 MWh annually. The project consists of three turbines, of 0.87MW each, run-of-river with small reservoir. Load factor was expected to be 53.3%. In October 2012, Thac Mo Hydro Power Joint Stock (a subsidiary of EVN) purchased 61% of the equity in the developer at a price of 48.3 million Dong (US$230,000). The output is sold to the national grid and evacuated via a 22kV line. Tariff was expected to be 601 Dong/kWh. Operational life was estimated at 30 years. Total investment was estimated at 50,371 million Dong US$2.4 million). Financing was expected to be done on a 60/40 debt to equity basis, with a commercial loan priced at 12.75% and a tenor of 12 years and 2 years grace. Based on D/E of 60/40, the total debt size was US$1.44 million, and US$ 0.96 million in equity. Project IRR was calculated at 9.02% without CDM financing and 15.56% with CDM financing. The project applied for UNFCCC CDM financing. Project location: 14o 43'04"N 107o 49'10"E http://www.intellasia.net/tmp-invests-48-3b-dong-in-dakrosa-hydropower-firm-240627 https://cdm.unfccc.int/filestorage/G/C/4/GC4XDI2MT6W8H0ERFO9BL37AJPZK51/PDD_Dakrosa2.pdf?t=VEh8bWhybW1kfDB2P_xe1UJDFfisIidXpfHF

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data