logo

Dale Avenue Pump Station – Collection System Improvements

Sector: Cement • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the so

Project Information FAQ

Project Information

3 Q
The project “Dale Avenue Pump Station – Collection System Improvements” is an infrastructure initiative in the Cement sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the southern portion of the town of Hillsborough rely on it. The DAPS project is a complete refurbishment of the existing pump station; including new concrete baffle walls in the wet wells, replacement of flow pumps and 36’’ steel piping, replacement of electrical equipment, including transformer, motor control centers and programmable logic controllers, replacement of diesel back-up generator, replacement of 400 LF of 36’’ force main and surge tanks, CIPP lining of 2,500 LF of existing RCP force main, replacement of elevator and other miscellaneous facility improvements. The pump station serves 90% of the City of San Mateo and must function at all times during construction. This required close coordination with the pump station operations team to complete the work in multiple shutdowns without functional disruption.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data