logo

Dalian Zhuanghe water plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing react

Status
Prospective
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dalian Zhuanghe water plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dalian Zhuanghe water plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing reaction + sedimentation + filtration and disinfection", and the mixing process adopts a mechanical stirring device; the flocculation process adopts a folded plate flocculation tank; The process adopts the inclined plate sedimentation tank; the filtration process adopts the V-type filter; the disinfection process adopts the sodium hypochlorite disinfection process; the raw water is treated by the water purification plant to meet the domestic application water sanitation standard (GB5749-2006). The construction scale of the sewage treatment plant is 10,000 tons/day, and the reclaimed water reuse scale is 5,000 tons/day. The length of the supporting pipe network is 47.2 kilometers, and the sewage treatment area is the area west of Laolongtou River, east of No. 9 Road, and north of No. 4 Road, with an area of ??about 5.4km2. The secondary treatment of the sewage plant adopts the A/A/O process, and the advanced treatment process adopts the methods of coagulation, sedimentation, filtration and disinfection to collect domestic sewage and some industrial wastewater. Type of concession is BROT with a period of 28 years. Total investment stands at $ 96.19 million. Financial close took place on July 8, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1e846bf4fdca4bdba63f8fd290175a70

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project