Dalian Zhuanghe water plant
One of 10,000+ projects Taiyo tracks in China.
Source: World Bank Group
This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing react
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Dalian Zhuanghe water plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing reaction + sedimentation + filtration and disinfection", and the mixing process adopts a mechanical stirring device; the flocculation process adopts a folded plate flocculation tank; The process adopts the inclined plate sedimentation tank; the filtration process adopts the V-type filter; the disinfection process adopts the sodium hypochlorite disinfection process; the raw water is treated by the water purification plant to meet the domestic application water sanitation standard (GB5749-2006). The construction scale of the sewage treatment plant is 10,000 tons/day, and the reclaimed water reuse scale is 5,000 tons/day. The length of the supporting pipe network is 47.2 kilometers, and the sewage treatment area is the area west of Laolongtou River, east of No. 9 Road, and north of No. 4 Road, with an area of ??about 5.4km2. The secondary treatment of the sewage plant adopts the A/A/O process, and the advanced treatment process adopts the methods of coagulation, sedimentation, filtration and disinfection to collect domestic sewage and some industrial wastewater. Type of concession is BROT with a period of 28 years. Total investment stands at $ 96.19 million. Financial close took place on July 8, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1e846bf4fdca4bdba63f8fd290175a70 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Beilungang CoalFired
- Wensu County Rural Roads Construction Project
- Huaxi section, part of the southern section of Huaguan Road
- Dongming County Highway
- Ji'an City urbanization project
- Wenzhou Oujiang Belt Expressway to Woqi Section and Oujiang Road East Extension
- Roadway No. 321 (Wuzhou Section)
- Shen-Shan Highway (Eastern Section)
