Dalian Zhuanghe water plant
Sector: Road • Location: China
Source: World Bank Group
This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing react
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing reaction + sedimentation + filtration and disinfection", and the mixing process adopts a mechanical stirring device; the flocculation process adopts a folded plate flocculation tank; The process adopts the inclined plate sedimentation tank; the filtration process adopts the V-type filter; the disinfection process adopts the sodium hypochlorite disinfection process; the raw water is treated by the water purification plant to meet the domestic application water sanitation standard (GB5749-2006). The construction scale of the sewage treatment plant is 10,000 tons/day, and the reclaimed water reuse scale is 5,000 tons/day. The length of the supporting pipe network is 47.2 kilometers, and the sewage treatment area is the area west of Laolongtou River, east of No. 9 Road, and north of No. 4 Road, with an area of ??about 5.4km2. The secondary treatment of the sewage plant adopts the A/A/O process, and the advanced treatment process adopts the methods of coagulation, sedimentation, filtration and disinfection to collect domestic sewage and some industrial wastewater. Type of concession is BROT with a period of 28 years. Total investment stands at $ 96.19 million. Financial close took place on July 8, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1e846bf4fdca4bdba63f8fd290175a70 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
