logo

Dalian Zhuanghe water plant

Sector: Road • Location: China

Source: World Bank Group

Project
Active

This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing react

Project Information FAQ

Project Information

4 Q
The project “Dalian Zhuanghe water plant” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is a water supply and drainage project in the field of municipal infrastructure, including a water supply plant and a sewage treatment plant, and is a stock asset project. The construction scale of the water plant is 50,000 tons/day, and the length of the pipe network is about 52 kilometers. The purification treatment of the water purification plant adopts the process of "mixing reaction + sedimentation + filtration and disinfection", and the mixing process adopts a mechanical stirring device; the flocculation process adopts a folded plate flocculation tank; The process adopts the inclined plate sedimentation tank; the filtration process adopts the V-type filter; the disinfection process adopts the sodium hypochlorite disinfection process; the raw water is treated by the water purification plant to meet the domestic application water sanitation standard (GB5749-2006). The construction scale of the sewage treatment plant is 10,000 tons/day, and the reclaimed water reuse scale is 5,000 tons/day. The length of the supporting pipe network is 47.2 kilometers, and the sewage treatment area is the area west of Laolongtou River, east of No. 9 Road, and north of No. 4 Road, with an area of ??about 5.4km2. The secondary treatment of the sewage plant adopts the A/A/O process, and the advanced treatment process adopts the methods of coagulation, sedimentation, filtration and disinfection to collect domestic sewage and some industrial wastewater. Type of concession is BROT with a period of 28 years. Total investment stands at $ 96.19 million. Financial close took place on July 8, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1e846bf4fdca4bdba63f8fd290175a70

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data