DALLAS BATTLEFIELD TRL FROM SR 61 TO SILVER COMET TRL-PH III
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
The project is completely within the City of Dallas. The project proposes to connect the existing Battlefield Trail to the existing Silver Comet Trail. The project will begin at the Silver Comet Trailhead near Seaboard Avenue and US 278. A pedestrian bridge is proposed to span US 278 at this location. The 10-foot-wide, concrete, roadside shared use path will continue along the north side of US 278
- Status
- Under Construction
- Sector
- Bridge, Cement
- Location
- Dallas, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about DALLAS BATTLEFIELD TRL FROM SR 61 TO SILVER COMET TRL-PH III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is completely within the City of Dallas. The project proposes to connect the existing Battlefield Trail to the existing Silver Comet Trail. The project will begin at the Silver Comet Trailhead near Seaboard Avenue and US 278. A pedestrian bridge is proposed to span US 278 at this location. The 10-foot-wide, concrete, roadside shared use path will continue along the north side of US 278 for approximately 1 mile, where it will connect with the existing Battlefield Trail on SR 61 at Chattahoochee Technical College. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Dallas |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
