Dallas I-345 Feasibility Study
Sector: Automotive • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
Interstate 345 is located on the east side of Downtown Dallas and carries traffic between I-30, US 75/I-45, and Woodall Rodgers Freeway (Spur 366). More than 180,000 vehicles use the 1.4-mile roadway every day. The Texas Department of Transportation is facilitating a feasibility study of I-345. This study is just the beginning of a thoughtful process that will help TxDOT determine the best way to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Interstate 345 is located on the east side of Downtown Dallas and carries traffic between I-30, US 75/I-45, and Woodall Rodgers Freeway (Spur 366). More than 180,000 vehicles use the 1.4-mile roadway every day. The Texas Department of Transportation is facilitating a feasibility study of I-345. This study is just the beginning of a thoughtful process that will help TxDOT determine the best way to address the needs of the roadway and the traveling public as they plan for current and future development. The feasibility study team will use a four-phase approach that will: Define the project approach Develop and screen concepts Refine reasonable alternatives Deliver collaborative and defendable study results The study team will collect, review and evaluate traffic counts and patterns; safety data; signal timing; current plans for committed transportation improvements in the study area; potential impacts to the local street grid and existing transportation infrastructure; and pedestrian, bicyclist, transit, and freight activity data. Traffic data will be one of the major components of the study and will include traffic counts, trip origin, and destination information. The team will also identify potential environmental constraints that would be taken into consideration during the feasibility study and that may need to be addressed during the environmental phase of the project. This study will also take into consideration ideas generated through the Dallas CityMAP process and previous studies. Dallas CityMAP examined the major interstates surrounding and entering downtown Dallas and how they could best integrate with the future vision of the city. TxDOT will work closely with the City of Dallas, Dallas County, the North Central Texas Council of Governments, and other agencies and stakeholders (residents, businesses, property owners, elected and public officials, neighborhood associations, etc.) during the study process to work towards finding solutions for I-345. Schedule and funding have not been identified for this project. Projects must go through a multi-year feasibility and environmental review process. If any changes are proposed for the roadway, they will need to be placed in the region’s current mobility plan, accounted for in local transportation plans, and funding identified. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Automotive projects in United States of America (USA)
- US 77 Victoria
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians
- Texas Electric Vehicle Infrastructure Plan
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
