Dallas North Tollway Extension
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Construction of new mainlane tollway facility between existing frontage roads consisting of grading, drainage, bridge structures, concrete pavement, CIP retaining walls, illumination, signs and sign structures, pavement markings, ITS infrastructure, toll gantries, landscape and irrigation.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial
- Location
- Prosper, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dallas North Tollway Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of new mainlane tollway facility between existing frontage roads consisting of grading, drainage, bridge structures, concrete pavement, CIP retaining walls, illumination, signs and sign structures, pavement markings, ITS infrastructure, toll gantries, landscape and irrigation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Prosper |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
