Dalles Campground Paving Improvements
Sector: Steel • Location: Marblemount, Washington, United States of America
Source: Dodge USA
The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest. The scope of work includes asphalt laying, sign installations, parking backstop installat
- Status
- Prospective
- Sector
- Steel, Rail, Commercial, Road, Car parking, Automotive, Metal, Manufacturing (Industrial)
- Location
- Marblemount, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dalles Campground Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest. The scope of work includes asphalt laying, sign installations, parking backstop installation, removing trees in various stages and log rail installation including the following: asphalt ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Marblemount |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Rail, Commercial, Road, Car parking, Automotive, Metal, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
