Dalton (GA) Walmart Supercenter 669-1005 SP
Sector: Manufacturing (Industrial) • Location: Dalton, Georgia, United States of America
Source: Dodge USA
Nstall Door(S) As Shown. - Re-work Existing Exterior Pavement In Accommodation Of New Exterior Door - Patch And Repair Existing Pavement Striping As Required To Maintain Compliance With Applicable Accessibility Code Door Hardware -update Hardware As Required Install Sales Floor Enclosure Door As Required Install New Push Button Release, Sign, And Horn At Auto Center Customer Service Door, Ref Spec
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Dalton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dalton (GA) Walmart Supercenter 669-1005 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nstall Door(S) As Shown. - Re-work Existing Exterior Pavement In Accommodation Of New Exterior Door - Patch And Repair Existing Pavement Striping As Required To Maintain Compliance With Applicable Accessibility Code Door Hardware -update Hardware As Required Install Sales Floor Enclosure Door As Required Install New Push Button Release, Sign, And Horn At Auto Center Customer Service Door, Ref Specifications |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Dalton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
