Dam - Blue Gulch Pond
Sector: Hydro • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
Project consists of installation of a new Canadian Dam Association registered dam with passive overflow as per consultant recommendation at Blue Gulch Pond in the Town of Pasadena. The project aims to supply remaining residents with quality safe drinking water by maintaining the existing reservoir at the same elevation and thereby ensuring an adequate supply of water to the local water treatment p
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Dam - Blue Gulch Pond
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project consists of installation of a new Canadian Dam Association registered dam with passive overflow as per consultant recommendation at Blue Gulch Pond in the Town of Pasadena. The project aims to supply remaining residents with quality safe drinking water by maintaining the existing reservoir at the same elevation and thereby ensuring an adequate supply of water to the local water treatment plant/system. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
