Dam and Intake Improvements
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
Project consists of replacement of the concrete dam at the intake and to provide a new intake system and screen that extends to the middle of the pond at Jersey Pond in the Town of Milltown Head of Bay D’Espoir. The project aims to eliminate erosion issues to improve public safety at the reservoir to improve the raw water quality by reducing the amount of silt entering the water system.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Cement, Hydro
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Dam and Intake Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of replacement of the concrete dam at the intake and to provide a new intake system and screen that extends to the middle of the pond at Jersey Pond in the Town of Milltown Head of Bay D’Espoir. The project aims to eliminate erosion issues to improve public safety at the reservoir to improve the raw water quality by reducing the amount of silt entering the water system. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Hydro |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
