Dam Gates Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Department of Public Services and Procurement Canada (PSPC) require a contractor who will provide all labour, sub-contractors, supervision, tools, equipment, and materials required to inspect, maintain, and repair the hoists for nine vertical lift gates at four dams. The period of the contract shall be for three (3) years with three (3) additional one-year option periods.
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Ottawa, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dam Gates Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Department of Public Services and Procurement Canada (PSPC) require a contractor who will provide all labour, sub-contractors, supervision, tools, equipment, and materials required to inspect, maintain, and repair the hoists for nine vertical lift gates at four dams. The period of the contract shall be for three (3) years with three (3) additional one-year option periods. |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Ottawa |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
