DAMASCUS WATER SUPPLY II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Second Damascus Water Supply Project includes: (i) an underground dam to capture the flow of the source (Figeh Spring); (ii) a pumping station at the Figeh Spring to increase season flows; (iii) a tunnel 15 kilometers in length from the spring to the principal storage reservoirs of Damascus; (iv) a principal storage reservoir (underground) at Wali; (v) distribution system reservoirs; (vi) a ne
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Tunnel, Government, Telecommunications
- Location
- Syrian Arab Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DAMASCUS WATER SUPPLY II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Damascus Water Supply Project includes: (i) an underground dam to capture the flow of the source (Figeh Spring); (ii) a pumping station at the Figeh Spring to increase season flows; (iii) a tunnel 15 kilometers in length from the spring to the principal storage reservoirs of Damascus; (iv) a principal storage reservoir (underground) at Wali; (v) distribution system reservoirs; (vi) a new pumping station and renovation of existing pumping stations; (vii) a telecommunication system for data transmission, water flow control and leak detection; (viii) engineering services for design and supervision; (ix) training of EPEF's staff and technical assistance to EPEF. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Syrian Arab Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Tunnel, Government, Telecommunications |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
