DAMASCUS WATER SUPPLY
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Water Supply Project includes (i) an underground cutoff wall to increase the available flow and structures to prevent pollution from surface water at Figeh spring; (ii) test pumping at Figeh to determine the storage characteristics of the aquifer and the maximum reliable yield which can be developed by pumping from the aquifer; (iii) a 15 km tunnel from Figeh to Damascus; (iv) reservoirs with
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Tunnel, Government
- Location
- Syrian Arab Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DAMASCUS WATER SUPPLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Water Supply Project includes (i) an underground cutoff wall to increase the available flow and structures to prevent pollution from surface water at Figeh spring; (ii) test pumping at Figeh to determine the storage characteristics of the aquifer and the maximum reliable yield which can be developed by pumping from the aquifer; (iii) a 15 km tunnel from Figeh to Damascus; (iv) reservoirs with a total capacity of about 75,000 cubic meters; (v) construction of a new pumping station and renovation of the existing pumping stations, including equipment for pumping control; (vi) installation of about 530 km of water mains in the distribution system; (vii) meter testing equipment, flow and pressure metering apparatus and other equipment to assist in the operation and maintenance of the distribution systems; (viii) training for EPEF staff in management and engineering; (ix) engineering and management consulting services; (x) studies of measures to reduce pollution in the Barada and Orontes River basins, including the sewerage of Damascus and engineering for treatment plants in the Homs/Hama area; (xi) training for Syrian staff; (xii) purchase of equipment for monitoring water quality. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Syrian Arab Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Tunnel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
