Damlapinar hydro power
Sector: Commercial • Location: Turkey
Source: World Bank Group
Damlapinar hydro power was a 42MW owned and operated by AES-IC Ictas Energy, a joint venture between US AES Corp (51%) and IC Holding (49%). The project increases AES' small hydro capacity in Turkey to 42 MW. The project cost was $65 million, of which $36 million was financed by a non-recourse seven-year term loan.
The 16 MW Damlapinar facility included two 8.2 MW Francis Turbines from Harbin Pow
- Status
- Prospective
- Sector
- Commercial, Wind, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Water Supply and Storage, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Damlapinar hydro power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Damlapinar hydro power was a 42MW owned and operated by AES-IC Ictas Energy, a joint venture between US AES Corp (51%) and IC Holding (49%). The project increases AES' small hydro capacity in Turkey to 42 MW. The project cost was $65 million, of which $36 million was financed by a non-recourse seven-year term loan. The 16 MW Damlapinar facility included two 8.2 MW Francis Turbines from Harbin Power Engineering, a Chinese manufacturer, and the Engineering, Procurement and Construction work was performed by IC Ictas Construction. Damlapinar was the first of two AES-IC cascading run-of-river facilities and included a small dam with storage capacity that will allow production planning for peak generation during key periods. The downstream 28 MW Kepezkaya facility, as well as the 18 MW Kumkoy small hydro project, located in Samsun, are both expected to start commercial operation by the end of the year. Electricity generated by the renewable power project was to be sold into the wholesale market through day-ahead spot sales or to eligible customers through short-term contracts |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Water Supply and Storage, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
