logo

Damlapinar hydro power

Sector: Water Supply and Storage • Location: Turkey

Source: World Bank Group

Project
Active

Damlapinar hydro power was a 42MW owned and operated by AES-IC Ictas Energy, a joint venture between US AES Corp (51%) and IC Holding (49%). The project increases AES' small hydro capacity in Turkey to 42 MW. The project cost was $65 million, of which $36 million was financed by a non-recourse seven-year term loan.

The 16 MW Damlapinar facility included two 8.2 MW Francis Turbines from Harbin Pow

Status
Prospective
Sector
Water Supply and Storage, Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Damlapinar hydro power

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Damlapinar hydro power” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Damlapinar hydro power was a 42MW owned and operated by AES-IC Ictas Energy, a joint venture between US AES Corp (51%) and IC Holding (49%). The project increases AES' small hydro capacity in Turkey to 42 MW. The project cost was $65 million, of which $36 million was financed by a non-recourse seven-year term loan. The 16 MW Damlapinar facility included two 8.2 MW Francis Turbines from Harbin Power Engineering, a Chinese manufacturer, and the Engineering, Procurement and Construction work was performed by IC Ictas Construction. Damlapinar was the first of two AES-IC cascading run-of-river facilities and included a small dam with storage capacity that will allow production planning for peak generation during key periods. The downstream 28 MW Kepezkaya facility, as well as the 18 MW Kumkoy small hydro project, located in Samsun, are both expected to start commercial operation by the end of the year. Electricity generated by the renewable power project was to be sold into the wholesale market through day-ahead spot sales or to eligible customers through short-term contracts

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project