logo
ProjectClosed

Danco Drive Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Work under this contract includes replacement of the existing bridge on Danco Drive over Perry Brook and the reconstruction of the approaches on Danco Drive with a dual precast concrete box culvert bridge, Bridge No 115008

Status
Closed
Sector
Cement, Government, Bridge, Road, Commercial
Location
Putnam, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Danco Drive Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Danco Drive Bridge Replacement” is an infrastructure initiative in the Cement sector, located in Putnam, Connecticut, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work under this contract includes replacement of the existing bridge on Danco Drive over Perry Brook and the reconstruction of the approaches on Danco Drive with a dual precast concrete box culvert bridge, Bridge No 115008

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Putnam

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Bridge, Road, Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project