logo
ProjectPassed Final Review, Pending Approval

Dandara Solar Power SAE

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a senior loan of up to USD 63.0 million to Dandara Solar Power, a Special Purpose Vehicle (SPV) wholly owned by Scatec ASA, to finance the construction and development of a 500 MWac solar PV plant with a 100 MWh Battery Energy Storage System (BESS) located in Nagaa Hammadi, Egypt. The electricity produced by the Project will be sold to Egypt Aluminium company (Egyptalum), as the offta

Status
Prospective
Sector
Water Supply and Storage, Energy Storage, Power Generation (CCGT), Geothermal, Warehouse, Natural Gas, Solar, Government, Commercial, Road, Manufacturing (Industrial), Residential, Steel, Metal
Location
Egypt
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Dandara Solar Power SAE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dandara Solar Power SAE” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

passed final review, pending approval

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Provision of a senior loan of up to USD 63.0 million to Dandara Solar Power, a Special Purpose Vehicle (SPV) wholly owned by Scatec ASA, to finance the construction and development of a 500 MWac solar PV plant with a 100 MWh Battery Energy Storage System (BESS) located in Nagaa Hammadi, Egypt. The electricity produced by the Project will be sold to Egypt Aluminium company (Egyptalum), as the offtaker, under a take-or-pay long-term Power Purchase Agreement (PPA). • Environmental and Social Impact Assessment (ESIA) including Management and Monitoring Plans - EN and AR; • Non-technical summary (NTS) - EN and AR; • Stakeholder engagement plan - EN and AR; and • Environmental and Social Action Plan (ESAP) - EN and AR. Download zip package in English Download zip package in Arabic Full ESIA documentation is available locally at: • EBRD Cairo Resident Office, EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo, Tel: +20 35419155 • EBRD Alexandria Resident Office, Regus offices, Kamarayet Roushdy building, Stanley - Corniche, Alexandria, Tel: +20 223225900 and Client website: https://www.scatec.com/en/sustainability/esg-resources/ Environmental or social enquiries Shady Khafagy Scatec – Egypt Office Building 44, The Northern 90th street, banks center, New Cairo, Cairo post@scatec.com +47 480 85 500

Original sector

Energy

Budget

Location

Country

Egypt

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Energy Storage, Power Generation (CCGT), Geothermal, Warehouse, Natural Gas, Solar, Government, Commercial, Road, Manufacturing (Industrial), Residential, Steel, Metal

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project