Daniel Mccall Reconstruction Phase 2
Sector: Water Supply and Storage • Location: Lufkin, Texas, United States of America
Source: Dodge USA
Base Bid1. Approximately 4,100 linear feet of HMAC street improvements including spot base repairs, level up course, full roadway reconstruction and final 2 HMAC wearing surface.2. Guardrail replacement at existing bridge structures Alternate Bid1. Approximately 4,100 linear feet of HMAC roadway reconstruction.2. Guardrail replacement at existing bridge structures Additive Alternate 11. 8x4 box cu
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Rail, Commercial, Mass Transit, Bridge, Road, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Lufkin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Daniel Mccall Reconstruction Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid1. Approximately 4,100 linear feet of HMAC street improvements including spot base repairs, level up course, full roadway reconstruction and final 2 HMAC wearing surface.2. Guardrail replacement at existing bridge structures Alternate Bid1. Approximately 4,100 linear feet of HMAC roadway reconstruction.2. Guardrail replacement at existing bridge structures Additive Alternate 11. 8x4 box culvert rehabilitation/ extension Bid |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Lufkin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Rail, Commercial, Mass Transit, Bridge, Road, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
