logo

Danilovgrad Municipal Infrastructure Project

Sector: Water Supply and Storage • Location: Montenegro

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

In December 2010, the Ministry of Finance of Montenegro and the Bank signed a loan agreement for an amount of up to EUR 5.35 million to finance the construction of a wastewater collection system and treatment plant and the modernisation of the water supply system in Danilovgrad. The water and wastewater system is operated by the municipally owned Water and Sewerage Company. The purpose of the Proj

Project Information FAQ

Project Information

5 Q
The project “Danilovgrad Municipal Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Montenegro. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2010, the Ministry of Finance of Montenegro and the Bank signed a loan agreement for an amount of up to EUR 5.35 million to finance the construction of a wastewater collection system and treatment plant and the modernisation of the water supply system in Danilovgrad. The water and wastewater system is operated by the municipally owned Water and Sewerage Company. The purpose of the Project is to address water and wastewater problems in Danilovgrad including inadequate coverage of the wastewater network, lack of treatment of wastewater before being discharged to the Zeta River and an extensive water distribution system lacking resilience and in relatively poor condition, resulting in a high level of non-revenue water. As the costs of the Project's components were higher than initially estimated, an increase of up to EUR 1.5 million is being considered by the Bank. The Project comprised two components: (1) modernisation and construction of water supply infrastructure and (2) wastewater collection and treatment infrastructure. Each sub-component of the water supply infrastructure has been completed, while implementation of the sewerage network and wastewater treatment plant is on-going. The loan increase will cover the updated costs of the: wastewater treatment plant, wastewater treatment plant odour control equipment and sludge transportation lorries.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data