logo
ProjectCancelled

Danilovgrad Municipal Infrastructure Project

One of 1,029 projects Taiyo tracks in Montenegro.

Source: European Bank for Reconstruction and Development (EBRD)

In December 2010, the Ministry of Finance of Montenegro and the Bank signed a loan agreement for an amount of up to EUR 5.35 million to finance the construction of a wastewater collection system and treatment plant and the modernisation of the water supply system in Danilovgrad. The water and wastewater system is operated by the municipally owned Water and Sewerage Company. The purpose of the Proj

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Residential
Location
Montenegro
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Danilovgrad Municipal Infrastructure Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Danilovgrad Municipal Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Montenegro. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2010, the Ministry of Finance of Montenegro and the Bank signed a loan agreement for an amount of up to EUR 5.35 million to finance the construction of a wastewater collection system and treatment plant and the modernisation of the water supply system in Danilovgrad. The water and wastewater system is operated by the municipally owned Water and Sewerage Company. The purpose of the Project is to address water and wastewater problems in Danilovgrad including inadequate coverage of the wastewater network, lack of treatment of wastewater before being discharged to the Zeta River and an extensive water distribution system lacking resilience and in relatively poor condition, resulting in a high level of non-revenue water. As the costs of the Project's components were higher than initially estimated, an increase of up to EUR 1.5 million is being considered by the Bank. The Project comprised two components: (1) modernisation and construction of water supply infrastructure and (2) wastewater collection and treatment infrastructure. Each sub-component of the water supply infrastructure has been completed, while implementation of the sewerage network and wastewater treatment plant is on-going. The loan increase will cover the updated costs of the: wastewater treatment plant, wastewater treatment plant odour control equipment and sludge transportation lorries.

Original sector

Municipal Infrastructure

Budget

Location

Country

Montenegro

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project