DANUBE-BLACK SEA CANAL
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would consist of the Construction of a 64 km canal from Cernavoda on the Danube to South Constanta-Agigea on the Black Sea. It would include construction of three ports on the canal (at Cernavoda, Medgidea, and Basarabi), two locks and their operating equipment (at Cernavoda and Agigea), related ancillary works and equipment (such as service roads, rail connections, utilities, building
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Rail, Power Generation (CCGT), Seaport, Government
- Location
- Romania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DANUBE-BLACK SEA CANAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would consist of the Construction of a 64 km canal from Cernavoda on the Danube to South Constanta-Agigea on the Black Sea. It would include construction of three ports on the canal (at Cernavoda, Medgidea, and Basarabi), two locks and their operating equipment (at Cernavoda and Agigea), related ancillary works and equipment (such as service roads, rail connections, utilities, buildings, signalling and control systems), and replacement, reconstruction or relocation of existing transport, irrigation and other facilities affected by the construction of the canal. The benefits for the Romanian economy of using its low cost energy saving inland waterway system more fully for large volumes of bulk cargo movement would be considerable as would the benefits generated from savings in ocean freight costs as a result of using large bulk carriers. The project would also benefit other Danubian countries, and would become an integral part of the European waterway system when the Rhine-Main-Danube canal is completed in 1984. It would also help accelerate economic development in the relatively poor Dobrogea region through which the canal runs, and provide local irrigation and power benefits. |
Original sector | Transportation |
Location
Country | Romania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Rail, Power Generation (CCGT), Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
