Danube Feasibility Study Phase I. – Technical measures to provide required fairway parameters between rkm 1880.260 and 1708.200 of the Danube
Sector: Commercial • Location: Slovakia
Source: Keep.EU
NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project will strengthen the sustainability of water transport between the Slovak Republic and other states on the Danube waterway. At the same time, the feasibility study will undertake a first step towards fulfilling the requirement to complete the construction of the TEN-T core network by 2030 stemming from Regulation (EU) No. 1315/2013 of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project will strengthen the sustainability of water transport between the Slovak Republic and other states on the Danube waterway. At the same time, the feasibility study will undertake a first step towards fulfilling the requirement to complete the construction of the TEN-T core network by 2030 stemming from Regulation (EU) No. 1315/2013 of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No. 661/2010 / EU. Sufficient traffic safety and waterway transport capacity depend directly on the degree of security of fairway (depth and width of the fairway and underpass under the line structures) as defined by relevant international regulations (Danube River Shipping Convention, AGN Agreement, Dunaj Commission Recommendations). In the section of the Danube between rkm 1880.26 – 1708.20 there are several locations and partial sections in which the parameters of the fairway are insufficient. OBJECTIVE(S) OF THE PROJECT: The main objective of the project is to develop a feasibility study, which will be the first phase of all activities aiming at a fundamental improvement of navigability conditions for international navigation operations on the Danube waterway in section rkm 1880.26 – 1708.20 (entire SK waterway stretch). The feasibility study is the recommendation of a technical solution that is feasible both technically and economically and will not have a negative impact on the environment. The chosen implementation variant of technical measures must respect the interests of environmental protection and complement other transport, economic and land-use planning interests in the area concerned. PLANNED PROJECT ACTIVITIES: The Feasibility Study will consist of the following parts (I. – XII.): I. Analysis of the development (period 1992 – 2016) and analysis of the present state of the Danube waterway in the area rkm 1880.26 – 1708.20 (Morava – Ipeľ) including its components with emphasis on parameters of the runway and their safety. II. Analysis of the impact of navigational track parameters and nautical maneuvering conditions in the rkm range 1880.26 – 1708.20 for navigational safety conditions. III. Influence of the route parameters of the section on the transport capacity of the international waterway in terms of transit and port operation Bratislava, Komárno and Štúrovo. IV. Definition of objectives to be achieved, definition of constraints and conditions. V. Analysis of all available documents and binding documents necessary for the feasibility study (legislation, body decisions, studies, research, projects, urban planning, etc.). VI. Variant draft technical measures necessary to achieve targets against the zero option (current status under point 1). VII. Definition of measures and their phasing out according to the different solutions. VIII. Main and secondary effects of solutions for transport, tourism, energy, cross-border impacts. IX. Environmental Study – Assessment of the impact of measures on the environment (EIA). X. Preliminary assessment of flood protection. XI. Economic evaluation of the technical solution variants by the method for inland waterways. XII. Conclusions and recommendations. TRANSBOUNDARY IMPACT: The international waterway of the Danube in the section between rkm 1880.26 – 1708.20 is administered by the competent authorities of the Slovak Republic in accordance with the relevant international conventions, with the administration of the border sections of this section together with the competent authorities of Austria and Hungary. PROJECT BENEFICIARIES / TARGET GROUPS: Waterway administrations within the Danube Region. The outcomes of the study will also lead to benefits for commercial but also for all for others users of waterway. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
