logo

Danube Rehabilitation Measures

Sector: Water Supply and Storage • Location: Slovakia

Source: Keep.EU

Project
Closed

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network.

OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water

Project Information FAQ

Project Information

5 Q
The project “Danube Rehabilitation Measures” is an infrastructure initiative in the Water Supply and Storage sector, located in Slovakia. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network. OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water Management Enterprise (SVP) as well as the Water construction state enterprise (VV) and by removing bottlenecks on the Slovak Danube stretch. SVP will purchase 2 new belt excavators which will be installed on a floating platform. VV will purchase 1 suction dredger and 1 belt excavator. The project aims to deliver a list of priority works to be implemented as pilot rehabilitation dredging works to reinstate a good navigation status in the Danube section of the Hrušov reservoir (rkm 1845 to rkm 1868). PLANNED PROJECT ACTIVITIES: The project consists of five activities: - Project management, communication and public consultation. - Final design of the dredging works priority measures. - Procurement and delivery of technical equipment to carry out rehabilitation dredging works. - Pilot activities implementation. - Evaluation and recommendation. TRANSBOUNDARY IMPACT: In the long-term, the project will contribute to increasing the safety and reliability of inland waterway transport along the corridor. PROJECT BENEFICIARIES / TARGET GROUPS: Shippers, stakeholders, relevant authorities, etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data