Danube Rehabilitation Measures
Sector: Water Supply and Storage • Location: Slovakia
Source: Keep.EU
NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network.
OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Slovakia
- Updated
- 22 Jul 2026
- Source
- Keep.EU
ConstructChat
Ask ConstructChat about Danube Rehabilitation Measures
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network. OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water Management Enterprise (SVP) as well as the Water construction state enterprise (VV) and by removing bottlenecks on the Slovak Danube stretch. SVP will purchase 2 new belt excavators which will be installed on a floating platform. VV will purchase 1 suction dredger and 1 belt excavator. The project aims to deliver a list of priority works to be implemented as pilot rehabilitation dredging works to reinstate a good navigation status in the Danube section of the Hrušov reservoir (rkm 1845 to rkm 1868). PLANNED PROJECT ACTIVITIES: The project consists of five activities: - Project management, communication and public consultation. - Final design of the dredging works priority measures. - Procurement and delivery of technical equipment to carry out rehabilitation dredging works. - Pilot activities implementation. - Evaluation and recommendation. TRANSBOUNDARY IMPACT: In the long-term, the project will contribute to increasing the safety and reliability of inland waterway transport along the corridor. PROJECT BENEFICIARIES / TARGET GROUPS: Shippers, stakeholders, relevant authorities, etc. |
Budget |
Location
Country | Slovakia |
Source
Source reliability | Medium |
Source | Keep.EU |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2023-07-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
