logo
ProjectClosed

Danube Rehabilitation Measures

One of 1,590 projects Taiyo tracks in Slovakia.

Source: Keep.EU

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network.

OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water

Status
Closed
Sector
Water Supply and Storage, Government
Location
Slovakia
Updated
22 Jul 2026
Source
Keep.EU

ConstructChat

Ask ConstructChat about Danube Rehabilitation Measures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Danube Rehabilitation Measures” is an infrastructure initiative in the Water Supply and Storage sector, located in Slovakia. Taiyo aggregates data on it from Keep.EU.

Participants

Sponsoring Agency

Status

Original status

Closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The project aims to close gaps, to remove bottlenecks and to overcome infrastructural barriers along the Danube waterway network. OBJECTIVE(S) OF THE PROJECT: The Action aims to implement the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its tributaries by modernising the dredging equipment and fleet of the Slovak Water Management Enterprise (SVP) as well as the Water construction state enterprise (VV) and by removing bottlenecks on the Slovak Danube stretch. SVP will purchase 2 new belt excavators which will be installed on a floating platform. VV will purchase 1 suction dredger and 1 belt excavator. The project aims to deliver a list of priority works to be implemented as pilot rehabilitation dredging works to reinstate a good navigation status in the Danube section of the Hrušov reservoir (rkm 1845 to rkm 1868). PLANNED PROJECT ACTIVITIES: The project consists of five activities: - Project management, communication and public consultation. - Final design of the dredging works priority measures. - Procurement and delivery of technical equipment to carry out rehabilitation dredging works. - Pilot activities implementation. - Evaluation and recommendation. TRANSBOUNDARY IMPACT: In the long-term, the project will contribute to increasing the safety and reliability of inland waterway transport along the corridor. PROJECT BENEFICIARIES / TARGET GROUPS: Shippers, stakeholders, relevant authorities, etc.

Budget

Location

Country

Slovakia

Source

Source reliability

Medium

Source

Keep.EU

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2023-07-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project